MIL-S-48573(MU)
telescope clamping mechanism shall conform to the requirements of 3.5 when
the applicable torques are applied to the telescope body and the clamp for
the telescope. Any rotation of the telescope within the clamp, or rota-
tion of the clamping mechanism about its own axis shall be determined by
the permanent displacement (lack of coincidence) of the telescope reticle
lines with respect to the target image lines.
PREPARATION FOR DELIVERY
5.
5.1 Packaging, packing and marking.- Packaging, packing and marking
shall be in accordance with Packaging Data Sheet 11741726. The level of
protection shall be as specified in the procurement document.
6.
NOTES
6.1 Intended use.- The sightunit, XM64E2 is used for laying the
Lightweight Company Mortar, 60MM, XM224 in deflection and elevation for
direct and indirect fire modes.
Procurement Documents should specify the follow-
6.2 Ordering data.-
ing:
(a) Title, number and date of this specification.
(b) Selection of applicable levels of preservation, packaging
and packing.
(c) Applicable stock number.
(d) Applicable packaging data sheet number (see 5.1).
(e) Provisions for First Article Testing.
Preparing activity:
Custodian:
Army - MU
Army-MU
Project No. 1240 -A705
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business