MIL-DTL-48558C
c. The designs remaining to be submitted and the expected date of submittal.
6.4 Drawings. Drawings listed in Section 2 of this specification under the heading
U.S. Army Armament, Research Development and Engineering Center (ARDEC)
Drawings may also include drawings prepared by, and identified as Edgewood Arsenal,
Frankford Arsenal, Rock Island Arsenal, or Picatinny Arsenal drawings. Technical data
originally prepared by these activities is now under the cognizance of ARDEC.
6.5 Packaging data sheet drawings. The following packaging data sheet drawings
should be obtained from U.S. Army ARDEC, ATTN: RDAR-EIL-P B455, Picatinny
Arsenal, NJ 07806-5000.
SPI 13005104
-
Special Packaging Instructions for Telescope, Elbow:
M138A1
6.6 Environmental samples. If desired by the manufacturer, it is acceptable to
verify compliance with the requirements of 3.7 through 3.13 inclusive only once per unit,
provided this verification takes place after the conclusion of all environmental testing
required for the given unit.
6.7 Thermal shock. A rate of change in temperature of 5°F per minute or less is
recommended to avoid subjecting the telescope to thermal shock.
6.8 Subject term (key word) listing.
Fire Control
Howitzer
M777
M198
Towed Artillery
6.9 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
Custodian:
Preparing activity:
Army-AR
Army-AR
(1240-2012-004)
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the
currency of the information above using the ASSIST Online database at
15
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business