MIL-C-48605A (AR)
4.2 Classification of inspections. The inspection requirements
specified herein are classified as follows:
a.
First article inspection (see 4.3).
Quality conformance inspection (see 4.4).
b.
c.
Special sampling inspection (see 4.5).
4.2.1 Inspection conditions. Unless otherwise specified, all
examinations and tests shall be conducted at the following standard
ambient conditions:
+50 deg to +90 deg F.
a.
Temperature
90% RH Max.
Relative humidity
b.
28 to 32 inches of Hg.
c.
Pressure
4.3 First article inspection.
4.3.1 First article submission. The requirement for first
article and the responsibility (Government or contractor) for the
first article testing shall be as specified in the contract and the
applicable drawing. The sample for the first article tests shall
consist of one (1) control assembly manufactured in the same reamer,
using the same materials, equipment, processes and procedures in
regular production. All parts and materials, including packaging
and packing, shall be obtained from the same source of supply as
used in regular production.
4.3.1.1 Government testing. When the Government is responsible
for conducting first article tests, the contractor, prior to
submitting the sample to the Government, shall inspect the sample to
ensure that it conforms to all the requirements of the contract and
the applicable drawings. The contractor shall submit a record of
this inspection with the sample including certified Test Report
(CTR) or Certificate of Conformance (COC) for the materials.
4.3.1.2 Contractor testing. When the Contractor is responsible
for conducting first article tests, the sample shall be inspected by
the contractor for all the requirements of the contract, all of the
examinations and tests specified in Table XIII (Functional Test) and
Table XIV (Sepcal Sampling) herein and to all requirements of the
applicalble drawings. The sample and a record of this inspection,
including CTR/COC, shall be submitted for the Governement approval.
The Government reserves the right to witness the Contractor's
inspection.
4.3.2 Rejection. If any assembly, component or test specimen
fails to comply with any of the applicable requirements, the first
article sample shall be rejected. The Government reserves the right
to terminate its inspection upon any failure of any assembly,
component or test specimen to comply with any of the stated
requirements.
19
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business